The Davis School District has invested nearly $2 billion dollars in facilities acquired over the life of the District. Operating and maintaining that size of an asset is an ongoing challenge. Since the money to build and maintain facilities is generated by taxes, the District is very careful of the type of buildings constructed, materials used, and systems used to stretch those tax dollars as far as possible while still adhering to the District motto, "Learning First."
 
The "Other Projects" pages are a comprehensive list of schools that have received renovations and upgrades over the past three fiscal years as well as those that are currently in progress. 

2015-2018 Fiscal Year Projects

Air Conditioning, Boilers and Plumbing

The schools listed had some areas that were already cooled. These projects replaced any worn out coolers and added to the spaces not currently cooled. 


fiscal year 2015-16:
  • Adelaide Elementary
  • Boulton Elementary
  • Centerville Elementary
  • Holbrook Elementary
  • Kaysville Elementary
  • Orchard Elementary
  • South Clearfield Elementary
  • Sunset Elementary
  • Valley View Elementary
  • Fairfield Junior High
  • Syracuse Junior High
  • Clearfield High 
fiscal year 2016-17
  • Clinton Elementary
  • Muir Elementary
  • Valley View Elementary
  • Bountiful Junior High
  • Clearfield High 
fiscal year 2017-18:
  • Adelaide Elementary
  • Bountiful Elementary
  • Centerville Elementary
  • Clinton Elementary
  • Crestview Elementary
  • Fremont Elementary
  • Hill Field Elementary
  • Meadowbrook Elementary
  • Oak Hills Elementary
  • Orchard Elementary
  • South Weber Elementary
  • Stewart Elementary
  • Sunset Elementary
  • Tolman Elementary
  • Washington Elementary
  • Vae View Elementary
  • Centerville Junior High
Fiscal Year 2018-19
  • Hill Field Elementary (AC)
  • Taylor Elementary (plumbing)
  • Valley View Elementary (AC)
  • Central Davis Junior High (Boilers)
  • Fairfield Junior High (AC)
  • Farmington Junior High (AC)
  • Syracuse Junior High (AC)

Asphalt, Concrete and Custodial Support

Asphalt and Concrete


fiscal year 2015-16:
  • Bountiful Elementary
  • Knowlton Elementary
  • Muir Elementary
  • Whitesides Elementary 
fiscal year 2016-17
  • Antelope Elementary
  • Muir Elementary
fiscal year 2017-18
  • Valley View Elementary
Fiscal year 2018-19
  • Boulton Elementary
  • Columbia Elementary
  • Millcreek Junior High

Custodial and Support


fiscal year 2015-16:
  • Holbrook Elementary
  • South Clearfield Elementary
  • Legacy Junior High
  • West Point Junior High
  • Viewmont High
fiscal year 2016-17:
  • Holbrook Elementary
  • South Clearfield Elementary
  • South Weber Elementary
fiscal year 2017-18:
  • Washington Elementary
Fiscal year 2018-19
  • Columbia Elementary

Ceilings, Flooring, Windows and Roofing

Ceilings


fiscal year 2016-17
  • Northridge High

Flooring


fiscal year 2015-16:
  • Bluff Ridge Elementary
  • Hill Field Elementary
  • Holt Elementary
  • Knowlton Elementary
  • Meadowbrook Elementary
  • Bountiful Junior High
  • Central Davis Junior High
  • Syracuse Junior High
  • Bountiful High
  • Clearfield High
fiscal year 2016-17:
  • Antelope Elementary
  • Cook Elementary
  • Washington Elementary
  • West Clinton Elementary
  • West Point Elementary
  • Farmington Junior High
  • Kaysville Junior High
fiscal year 2017-18:
  • Burton Elementary
  • South Weber Elementary
  • Farmington Junior High
  • Sunset Junior High

Windows


Fiscal year 2015-16
  • Fremont Elementary
Fiscal Year 2018-19
  • Adelaide Elementary
  • Holt Elementary
  • Tolman Elementary
  • Vae View Elementary
  • Whitesides Elementary
  • Layton High School

Roofing


Fiscal year 2018-19
  • Bluff Ridge Elementary
  • Taylor Elementary

Major Capital and Site Renovations

Major projects

Davis High School practice field drainage

Project Overview 

In 2004, when Davis High was rebuilt, the old drivers training range located at the east of the football field, was converted into the practice field. 

The topsoil on the practice field supported the natural grass very well, however, the ground six inches below the sod is compacted. The compacted base did not soak up water. During heavy rainstorms, water ran across the practice field, under the bleachers, across the track, and onto the football field. The excess water caused ripples in the base course under the artificial turf that had created tripping hazards on the football field. 

To prevent the excess water from making it to the football field, a curb and gutter was installed along the west side of the practice field. The curb and gutter directs the runoff to sumps. The grassy hillside on the north and south of the visitor bleachers was replaced with rock cobble and trees. 

The project was completed spring 2018. 

For more information on the selection of the construction manager/general contractor, click here. 

Farmington Bus Maintenance Facility

Project Overview

A maintenance facility will be constructed on the existing site of the Farmington bus lot adjacent to Farmington High School. 

Parking canopies will also support photo voltaic panels that will provide solar power to offset the electric bills at the high school. 

Also planned, but not constructed at this time, is a new maintenance building which will contain two maintenance bays, a bus wash bay, offices and lounge space for drivers. 

Hogan & Associates in the capacity of general contractor, received bids from sub-contractors for this project. 

Construction is expected to be completed Fall 2018 with a guaranteed maximum price of $6,524,208. To view the memorandum, click here.

To view information on the selection of the contract manager/general contractor, click here.

Layton High School turf and track installation

Project Overview

The existing natural grass football field at Layton High School was removed and replaced with artificial sports turf. This allowed the football field to be used as a multi-purpose field to accommodate football, soccer and physical education. 

Additionally, the existing running track was replaced with a post-tensioned concrete track with a polyurethane surface. 

Drainage issues were corrected and perimeter fencing replaced. 

Work was completed summer 2017. 

For more information on the selection of the construction manager/general contractor, click here.

Minor Capital and Site Renovations

Auditorium Renovations


fiscal year 2015-16:
  • Northridge High
  • Clearfield High 
fiscal year 2016-17
  • Clearfield High 

Capital Renovations


fiscal year 2015-16:
  • Holt Elementary
  • Parkside Elementary
  • South Clearfield Elementary
  • Bountiful Junior High
  • Bountiful High
  • Clearfield High
fiscal year 2016-17:
  • Adams Elementary
  • Doxey Elementary
  • Meadowbrook Elementary
  • Oak Hills Elementary
  • Syracuse Elementary
  • Bountiful Junior High
  • West Point Junior High
  • Bountiful High
  • Davis High
  • Northridge High
fiscal year 2017-18:
  • Washington Elementary
  • Whitesides Elementary
  • Central Davis Junior High
  • Kaysville Junior High
  • South Davis Junior High

Site Renovations


Fiscal year 2015-16
  • Foxboro Elementary
  • Lincoln Elementary
  • Millcreek Junior High
  • North Layton Junior High
Fiscal Year 2016-17
  • Bluff Ridge Elementary
  • Endeavour Elementary
  • Knowlton Elementary
  • Davis High

Restroom Upgrades

Restrooms


Fiscal year 2015-16
  • Adelaide Elementary

Fiscal Year 2016-17

  • Adelaide Elementary
  • Hill Field Elementary
  • Stewart Elementary
  • Tolman Elementary
  • Windridge Elementary
fiscal year 2017-18
  • Bountiful Elementary

Security

Projects include but are not limited to creating or repairing vestibules to increase school safety and security.  


fiscal year 2015-16:
  • Burton Elementary
  • Crestview Elementary
  • Doxey Elementary
  • Ellison Elementary
  • Layton Elementary
  • Oak Hills Elementary
  • Syracuse Elementary 
fiscal year 2016-17
  • Clinton Elementary
  • Muir Elementary
  • Valley View Elementary
  • Bountiful Junior High
  • Clearfield High 
fiscal year 2017-18:
  • Adelaide Elementary
  • Bountiful Elementary
  • Centerville Elementary
  • Crestview Elementary
  • Fremont Elementary
  • Hill Field Elementary
  • Meadowbrook Elementary
  • Oak Hills Elementary
  • Orchard Elementary
  • South Weber Elementary
  • Stewart Elementary
  • Sunset Elementary
  • Tolman Elementary
  • Washington Elementary
  • Vae View Elementary
  • Centerville Junior High